Gold said: My weekly game, the scheduler always proposes 1 week gap, not 2 weeks. I have used the LFG before. Since you said you don't use the LFG, Dorgrim, maybe try going into your game's LFG (where it says Look For Players Disabled > Manage Listing) and set a Weekly game frequency there. You can keep the LFG disabled, or enable it for a moment and disable it. Maybe that will cause your default scheduler gap to set to 1 week. The Frequency setting currently has just 3 options for repeating: Weekly Every Other Week Once A Month It could be that the default is Every Other Week for people who haven't touched the LFG Frequency setting. Ziechael based on your experience you could probably test this too and see if you can get the weekly by setting Frequency drop-down on LFG. You're directions don't match what I see. This is because I've never needed or bothered with creating an LFG listing. This might have changed my normal scheduler. I am not sure. I did set it for a close interval to current time and it did select the next week but, I am not sure if this is because it had autoselected the next week previously to my setting it. I don't think I will be able to tell until after this Saturday (my next game). However: [Devs] I should not have to use the LFG scheduler for the system to learn what frequency to use. [Expected Result] The autoscheduler should work out of the box without me needing to muck around with the LFG settings. I never plan to use them for 99% of games I run. The scheduler should be able to tell, like it did before the change , that I schedule weekly.